Email: [email protected]

Tel: +86-379-60866465

Home

Product

Case

News

About us

Contact us

Cases
Reconstruction and expansion project of Hecheng-Li
Case introduction
The total length of the route of this project is 18.99km, including roadbed, road surface and drainage, bridge culvert, route crossing and traffic engineering, greening and environmental protection engineering and facilities along the route. The project has 31 large, medium and small bridges, including 1 bridge, 9 medium bridges and 21 small bridges, with a total length of 1837.94m.
Equipment configuration
Cases
Contact us
Please contact us if you have any question.
+86-379-60866465
online service
Leave Us A Message

Want To Discuss About Your Machine Needs?

CONTACT US
@ Copyright of Luoyang Gengli Engineering Equipment Co., Ltd. All rights reserved.
Want To Discuss About Your Machine Needs?
Contact us
@ Copyright of Luoyang Gengli Engineering Equipment Co., Ltd. All rights reserved.