Email: [email protected]

Tel: +86-379-60866465

Home

Product

Case

News

About us

Contact us

Cases
Bozhou branch railway subgrade construction
Case introduction
The main line of Bozhou Spur Railway is 49.67 km long. It involves a total of three stations, namely Bole, Shuanghe and Bortala, with a total investment of 1.14 billion yuan. The Alatau Mountain Tunnel is the only single-line tunnel project in the whole line, with a length of 2,585 meters. Two-way construction of the tunnel. From June , the construction method was manually punched and replaced with a three-arm rock drilling rig for mechanical drilling. The daily progress of the tunnel was 6 meters, which accelerated the progress of the tunnel and accelerated the tunneling process.
Equipment configuration
Cases
Contact us
Please contact us if you have any question.
+86-379-60866465
online service
Leave Us A Message

Want To Discuss About Your Machine Needs?

CONTACT US
@ Copyright of Luoyang Gengli Engineering Equipment Co., Ltd. All rights reserved.
Want To Discuss About Your Machine Needs?
Contact us
@ Copyright of Luoyang Gengli Engineering Equipment Co., Ltd. All rights reserved.