G25 Changshen Expressway (Deqing to Fuyang )
Case introduction
G25 Changshen Expressway (Deqing to Fuyang ) with a total length of 62.715 km.The main project line adopts two-way and six-lane expressway standard in the "Technical Standards for Highway Engineering" (JTG B01-2014), the design speed is 100km/h, the standard width of the roadbed is 33.5m; the interconnection line adopts the standard of the secondary road, and the design speed is 60 km/h, subgrade width is 12m.